MedicalRegsdotCom banner
MedicalRegsdotCom avatar
MedicalRegsdotCom
@medicalregsdotcom606
Subscribers27
Views2.6K
Videos28
MedicalRegsdotComPublished at February 24, 2020 at 04:59 PM2:02
Insider tips to speedup certification by MedicalRegs.com thumbnail

Insider tips to speedup certification by MedicalRegs.com

6 years agoLong-tail
insidertipsspeedupcertificationmedicalregsinsider tips speedup
Published time
February 24, 2020 at 04:59 PM
Duration
2:02
Video type
-
Channel region
-
Publish Timing Insight
Not enough timing data
This channel still lacks enough historical upload timing data. Let the channel accumulate more snapshots before evaluating the best timing.
Monetization Insight
No clear monetization tags yet
Focus on view growth, engagement quality, and topic competition to judge monetization potential.
Action Suggestion
Watch for sustained growth
The basic conditions are already in place. Keep watching 7-day views and revenue before deciding whether this topic should become a series.
Views
22
Likes
2
Comments
0
Estimated Daily Revenue
-
Estimated Total Revenue
$0.01 - $0.08
RPM Range
$0.6 - $3.5
1D Views Gain
0
7D Views Gain
0
1D Likes Gain
0
7D Likes Gain
0
1D Comments Gain
0
7D Comments Gain
0
Velocity Score
0%
Topic Cluster
insider
Video Description
Insider Tips To Speed-Up Your Product Safety Certification Ideally, you should design your device to meet the applicable standards. Pre-certification review Double-check your device construction and components to applicable standards before submitting for formal certification. There's a 90% chance that at least one area will fail to meet the requirements. Documentation to submit: Isolation diagram. instructions, schematics: Electrical, pneumatic & hydraulic, mechanical drawings, critical components list, and label artwork Keep it organized Provide a secure link to your documentation rather than email attachments or piece-by-piece emails. Create folders to organize documents. essential performance List the essential performance of your device as this will be the pass or fail criteria for some tests. Critical components list Include components in primary, hazardous secondary voltage, and safety circuits. Also, include polymeric parts used for an electrical enclosure, insulation including PCB, and label materials. A "BOM" is Insufficient Create a spreadsheet for the critical components identifying the following: Manufacturer, model, & specifications. Attach proof of certification/approval. Component Conditions of Acceptability Make sure you use the components based on conditions. Component test reports will identify these conditions. PCB / PWB Include certification info. to UL-94 flammability rating or equivalent international standard. Include material type (i.e., FR4), CTI and conformal coating. Provide PCB trace voltage map. Provide unpopulated PCB sample. label material Provide label material information and approval. Some test labs are picky about this. The label material should be compatible with the device surface. isolation / insulation diagram The diagram will show where the patient and user contacts are on the device and will determine the insulation requirements, spacing, and test voltages. Instructions Submit quick guides, IFU, maintenance, and servicing instructions. It's okay if initially in draft form. rmf Submit RMF per IEC 60601-1 in accordance with ISO 14971. Collateral Standards Include documentation for usability, home healthcare, software, etc. if part of your certification requirements. construction review The test lab engineer will dissect your device and compare its construction to the requirements clause by clause. At this stage, all required information should be in front of the test lab engineer. Keep the momentum going by not having to stop so the engineer can request for additional information. If the test lab engineer has to stop while waiting for information, he/she will jump to another project. An engineer may have five projects going on at the same time. You will have to wait for your turn again. testing Depending on failures discovered during construction review, the testing phase can begin or delayed. test report Once the assessment is successful, a test report will be issued to you. conclusion The small amount of time you spend organizing your documents and providing needed information will benefit you by avoiding unnecessary delays.
Related Topics
Continue with closely related videos to judge topic depth and content format.
Topic: insider
Not enough related-topic video data yet.
Video FAQs

These FAQs clarify what this video page measures, why revenue is estimated, and how to use the page for content research.

What can you learn from this video analytics page?

This page shows views, likes, comments, RPM and revenue estimates, publish timing, topic tags, related videos, and the broader channel context behind the video.

Why are RPM and revenue numbers estimates?

Actual earnings depend on monetized playbacks, audience geography, seasonality, advertiser demand, and monetization status. CloutOrbit provides directional estimates for benchmarking, not exact payouts.

How should you use this page for content research?

Compare timing, topic tags, monetization signals, and adjacent videos from the same channel to spot formats, themes, and publishing patterns worth testing.